diver.net |
Hey, where is the engineer in you? |
Posted by Jeff Shaw on September 12, 2007 at 19:25:11: In Reply to: Would not be USCG approved. posted by Chuck Tribolet on September 12, 2007 at 05:29:47:
CASE BY CASE APPROVAL “Case-by-Case Approval” is an approval procedure that was created to facilitate industry and ensure vessel safety. This process requires the Coast Guard to consider the circumstances surrounding the request on an individual basis for a specialized product that will be installed on a specific ship and will not be mass produced. Equipment or products approved under this unique procedure are not issued a Coast Guard Certificate of Approval, which is issued after the completion of Coast Guard Type Approval. In addition, a follow-up program is not required to monitor product uniformity because there is no mass production of the product or equipment approved under this process.
|
Follow Ups:
|
Name: | |
---|---|
E-Mail: | |
Subject: | |
Message: | |
Optional Link URL: | |
Optional Link Title: | |
Optional Image URL: | |
Post Background Color: | White Black |
Post Area Page Width: | Normal Full |
You must type in the scrambled text key to the right. This is required to help prevent spam bots from flooding this BBS. |
|
Text Key: |